Two Storey Flat Pack Office and Welfare Facility Case Study

Our Lincolnshire based client contacted us with an enquiry for a two storey flat pack office and welfare facility, which was required for employees of their new anaerobic digestion plant. Our client operates within the biogas industry, predominately dealing with the process of turning food waste into energy through anaerobic digestion.

0
4

Container(s)

0
150

SQ FT

0
60

DAYS IN TOTAL

Lincoln

Container
Case Study

After meeting with our client and discussing their requirements, we advised them on the specification for each unit and the design of the overall structure. The construction consisted of four 20ft new flat pack offices each with two double glazed uPVC windows with a tilt and turn mechanism, a lockable aluminium roller shutter, an external door and full electrical package with sockets. One of these offices needed to provide toilet and shower facilities, so we bespoke fitted the plumbing on site to comply with the WRAS (Water Regulations Advisory Scheme). We also supplied an under the counter fridge and a microwave for one of the offices. The units were to be stacked two high, therefore access was required to the top level of the structure. We custom built a staircase with a landing and supplied relevant support posts.

Case Study

Summary

We carry out a lot of on-site assembly work and are experts when it comes to complex container deliveries, our client was very happy with their new structure and how the siting and delivery was handled by our team.

Project

Vitals

  • Location

    Lincoln

  • Container Size (Sq Ft)

    150

  • Duration (days)

    60

  • Containers Used

    4