Initially it seemed that only a basic specification for electrics, lining, side removal and linking was required. However, it quickly became apparent that this build required certain U values for building control to approve it. After some extensive research, we sourced suppliers who could provide the appropriate materials. For example, the walls and roof had to have a 0.16 U value, so we could not use our regular melamine lining as this gave a higher U value. So, we used Speedline thermal laminate lining, which we built up to 172.5mm. This was a lot more costly than regular melamine, but without it, the build would not have been approved. The majority of our builds that require windows use standard anti-vandal windows, but here we needed windows with a 1.1 U value, so triple glazed windows were used. A final specification was presented to the architect, and it was a whole year later when this was approved, and the job booked in with us.
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-28-382x382.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-26-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-22-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-3-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-2-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-20-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-8-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-9-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-7-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-4-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-5-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-13-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-14-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-12-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-10-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-11-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-19-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-17-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-15-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-16-382x299.jpg)
Case Study
Summary
Due to the tight regulations, and the ongoing correspondence between the architect, client, building control and us, this build took 9 weeks in total from payment to delivery, which is longer than our usual build time. However, without this extra time spent, the build would not have been approved.
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-36-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-35-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-38-382x382.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-37-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-34-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-31-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-33-382x299.jpg)
![](https://www.lioncontainers.co.uk/wp-content/uploads/2018/05/john-smart-32-382x299.jpg)
Project
Vitals
Location
Edinburgh
Container Size (Sq Ft)
225
Duration (days)
45
Containers Used
2